Business criticality and change risk are different dimensions
Business criticality shows how painful a failure will be for users or the business. Change risk shows how easily the proposed change could disrupt behavior. A critical flow may have low change risk when the fix is well isolated, while a secondary module may have high change risk because of a shared utility and missing tests.
Do not reduce these dimensions to one score. Make visible unknowns explicit: an unknown owner, unverified configuration precedence, or conflicting docs affect the decision even when business impact has not yet been assessed.
Minimal risk-map entry
| Field | What to record |
|---|---|
| Area | subsystem, flow, or specific module |
| Business criticality | low / medium / high and why it matters |
| Change risk | low / medium / high and the mechanism of possible impact |
| Risk categories | money, integration, data, dates, ownership, coverage, and so on |
| Evidence | paths, tests, logs, Git history, reports |
| Missing checks | what exactly has not yet been checked |
| Recommended action | a concrete decision and next step |
Examples of decisions, not generic improvement
mrr-engine / pause-resume MRR: high business criticality and high change risk; approximately 25% coverage and a possible code/docs discrepancy — characterize behavior and check the owner before changing anything;payments / retry recovery: high/high because of money and external integration — gather recovery evidence and narrow the scope to one retry path;config / timezone + feature flags: medium/high — document precedence and perform manual verification for dates and flags;legacy/OldBillingUtils.java: broad impact and weak tests — build a module/flow map first instead of starting a mass refactor.
Operational actions from the risk map
A risk map should lead to a decision: what can be done now, what needs evidence, and what should be deferred. “Improve quality” without an owner, scope, and check is not an operational action.
- characterize current behavior for a high/high flow;
- gather more evidence when unknowns block the assessment;
- identify an owner for the business rule or critical integration;
- document configuration precedence when behavior depends on several layers;
- hold the change or narrow the scope when evidence is insufficient;
- freeze changes or defer the work when risk exceeds verification readiness.
Git churn as a supporting signal
In the learning example, the result might be 11, but treat this only as a churn signal. The number alone, without a period, source, and threshold, does not prove risk. Add it to the evidence, compare it with other modules, and decide whether deeper discovery is needed.
git log --since="1 year ago" --name-only --pretty=format: \
| grep 'mrr-engine/MrrFormulas.java' | wc -lCanonical lesson source · JavaRush