Pilot slice: the smallest unit of migration execution
A pilot is not “half of a migration,” but a bounded check of a specific source-to-target hypothesis. Choose one endpoint, job, adapter, or other observable flow for which you can name inputs, outputs, dependencies, owner, and stop condition.
Separate migration execution into preparation, pilot, verification, and decision. Before the pilot, have migration discovery, compatibility assumptions, and a rollback path; otherwise a small diff creates a small but unpredictable risk.
Branch and worktree as boundary controls
| Step | What to record | Why |
|---|---|---|
| Baseline | revision, clean/known diff, available checks | have a comparison point |
| Branch | separate name and one pilot scope | do not mix migration with feature work |
| Worktree | isolated path, owner, and cleanup rule | reduce overlap between parallel changes |
| Review | diff, affected paths, risk, and evidence | stop scope drift before merge |
| Decision | GO, HOLD, NARROW, or ROLLBACK | make the result explicit |
Entry and exit gates for a pilot slice
- Describe the migration hypothesis and bounded affected area in the task spec and migration plan.
- Create a baseline revision and branch/worktree; do not mix unrelated changes.
- Check that the rollback trigger, owner, and checkpoint are known before the first edit.
- Perform only the agreed slice and collect the diff, focused checks, and behavior evidence.
- Choose GO, HOLD, NARROW, or ROLLBACK; expanding scope requires a new decision.
When to stop a pilot
- the source baseline cannot be reproduced or a critical input remains Unknown;
- an undescribed data-format, configuration, or side-effect change is found;
- the behavior comparison has no observable oracle or reveals a discrepancy;
- rollback cannot return code and state to a defined safe point;
- the diff leaves the bounded slice or requires an unapproved dependency upgrade.