Implementation sprint as a short delivery loop
An implementation sprint is not permission to work without limits, but a short delivery interval with one outcome, a bounded set of slices, and a predefined exit. The sprint should turn an approved plan into a reviewable increment, not hide uncertainty behind a calendar label.
Each slice should have an owner, input, expected output, verification, and checkpoint. If a slice turns out to be larger than planned or changes the contract, split it or return to planning rather than quietly adding it to the sprint.
Sprint rhythm
- State the sprint outcome and non-goals in terms of observable behavior.
- Break the outcome into small slices with sequence and stop conditions.
- At each checkpoint, inspect the diff, targeted signals, and remaining Unknowns.
- End the sprint with one of these decisions: DONE, CONTINUE WITH APPROVAL, or HOLD.
- Update the evidence/handoff record even when the result is HOLD.
Sprint plan
# IMPLEMENTATION_SPRINT_PLAN.md
Outcome: one reviewable capstone slice
Slices: contract -> implementation -> targeted verification -> review
Checkpoint: inspect diff and command status after each slice
Owner: <role>
Exit: acceptance met, evidence linked, or HOLD with reason
Deferred: unrelated cleanup and unverified integrations